
250KVA FAW Diesel Generator 3 Phase
250KVA FAW Diesel Generator 3 Phase
250KVA FAW Diesel Generator Powered by CA6Dl2-30D, 6 Cyl, 4-Stroke, Diesel series engine. Engine make CA6Dl2-30D Displacement 8.57L Cylinder bore/stroke 112mm x 145mm Fuel system In Line fuel Injection Pump Cylinders 6 Cylinder arrangement Vertical inline Engine output power at 1500rpm 227 KW Turbocharged or normally aspirated Turbo Charged Cycle 4 Stroke Combustion system Direct Injection Compression ratio 17.5:1 Fuel tank capacity 400 Litres Fuel consumption 100% 35.4 L/H Fuel consumption 75% 26.8 L/H Fuel consumption 50% 22.4 L/H Fuel consumption 25% 17.5 L/H Oil type 15W40 Oil capacity 30 Liter Cooling method Water cooled Coolant capacity (including radiator) 16 Litre Starter 24 volt Governor system Electronic Engine speed 1500 RPM
Alternator Specs 250KVA Werna/Evotech Alternator or Equal Condition: New product Phase: 3 Phase Frequency: 50 Hz Voltage: 380v 3 Phase Protection: Yes Rpm speed: 1500 rpm Poles: 4 Efficiency: 94.8% Constant speed alternator Brushless Voltage regulator: AVR
Controller System Specs Smartgen Controller SmartGen generator controllers are used for automatic and monitor control system of gen-set to achieve automatic start/stop, data measure and alarm protection. The controller adopts large liquid crystal display (LCD) and selectable Chinese, English or other languages interface with easy and reliable operation. Gen-set automatic controllers adopt 32 bits microprocessor technology with precision parameters measuring, fixed value adjustment, time setting and threshold adjusting and etc.. Majority parameters can be configured from front panel, and all parameters can be configured by USB interface (or RS485/Link interface) to adjust via PC. It can be widely used in all types of automatic gen-set control system with compact structure, advanced circuits, simple connections and high reliability.
Warranties & Other Info ENGINE MECHANICAL WARRANTY 1 YEAR / 1000 HRS From date of collection/Delivery Warranty is only on Mechanical Parts not on Electrical Components Warranty only applies if service schedule is maintained Warranty Void: Electrical cable is not connected correctly Generator overload, abused or the machine is glazing (Under Load or Unbalance Phasing). SERVICE SCHEDULE: First Service: 50 hrs / 3 Months Second Service: 200 hrs / 6 Months Third Service: 550 hrs / 12 Months, Continue once a year or 1000hrs AUTOMATIC START: 10 SECONDS DELAY, 10 TO 35 SECONDS WARMUP PLEASE NOTE: Generator must not run less than 35% of load for long periods this will cause glazing. All ratings are approximate and at SEA LEVEL. Engines need to be de-rated for altitude. A rough guide to de-rate performance is 1% for every 100m above sea level. I.e: A 20KVA at sea level is an 18KVA at 1000m above sea level (10% less) etc. The generator will not be able to take the full load instantaneously. The load should be added to the generator gradually. 50% initially and then stepped up over time once engine is up to temperature.
